Data centers and new power in Guadalupe Cty, NM

883 MW of new power is waiting to connect to the grid in Guadalupe Cty, NM — 5 active requests. Typical wait: 6.7 years. 1 projects are built, 4 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Guadalupe Cty itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Guadalupe Cty

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Guadalupe Cty right now.

883 MW
of new power is waiting to connect
5 projects asked. Not yet approved. Roughly what 706,000 homes use.
90 MW
has actually been built
1 projects switched on so far.
6.7 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 10%
  • Still waiting 50%
  • Withdrawn 40%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Guadalupe Cty.

What kind of power is asking to connect

  • Wind 73%
  • Solar 27%

By capacity requested. Data as of 14 October 2026.

All the numbers

10 requests ever filed
Pending applications
5
of 10 ever filed
Capacity queued
883 MW
requested, not committed
Already built
90 MW
1 projects connected
Built vs decided
20.0%
4 withdrawn
Median wait
6.7 yr
for applications still pending
Connected capacity
235 MW
indicator, see note

Source: interconnection queues published by PNM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built190 MW10.0%
Still waiting5883 MW50.0%
Withdrawn41.1 GW40.0%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Wind3643 MW
Solar2240 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 10 by size
ProjectTypeCapacityStatusFiledQueue
GASNA 4 LLCSolar300 MWwithdrawn2006-11PNM
IA-PNM-2014-01Solar300 MWwithdrawn2014-02PNM
IA-PNM-2016-01Wind300 MWwithdrawn2016-05PNM
IA-PNM-2023-08Wind300 MWactive2022-12PNM
Old Route 66 PowerSolar200 MWactive2021-06PNM
IA-PNM-2023-09Wind199 MWwithdrawn2022-12PNM
IA-PNM-2012-05Wind198 MWactive2012-12PNM
IA-PNM-2020-01Wind145 MWactive2020-01PNM
IA-PNM-2003-01Wind90 MWcompleted—PNM
IA-PNM-2012-04Solar40 MWactive2012-08PNM

How Guadalupe Cty compares

#426 in the US · #11 in NM

Guadalupe Cty ranks #426 of 1,607 US counties by power waiting to connect, and #11 of 21 in New Mexico.

CountyWaitingCapacity queued
Bernalillo Cty213.9 GW
Roosevelt County92.4 GW
Valencia Cty112.2 GW
San Juan County92.1 GW
Santa Fe County91.6 GW
Torrence51.2 GW
Lea County91.1 GW
Doña Ana Cty7953 MW

Common questions about power in Guadalupe Cty

How long does it take to get power for a data center in Guadalupe Cty, NM?

The median wait for a project still in the interconnection queue in Guadalupe Cty is 6.7 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Guadalupe Cty have reached energization and 4 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Guadalupe Cty, NM?

883 MW is currently requested across 5 active interconnection requests, and 90 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Guadalupe Cty, NM a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New Mexico policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Guadalupe Cty — PNM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Guadalupe Cty

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.