Data centers and new power in Pasco County, FL

862 MW of new power is waiting to connect to the grid in Pasco County, FL — 4 active requests. Typical wait: 5.0 years. 5 projects are built, 10 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Pasco County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Pasco County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Pasco County right now.

862 MW
of new power is waiting to connect
4 projects asked. Not yet approved. Roughly what 689,000 homes use.
630 MW
has actually been built
5 projects switched on so far.
5.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 26%
  • Still waiting 21%
  • Withdrawn 53%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Pasco County.

What kind of power is asking to connect

  • Natural gas 67%
  • Batteries 23%
  • Solar 9%
  • Other 2%

By capacity requested. Data as of 14 October 2026.

All the numbers

19 requests ever filed
Pending applications
4
of 19 ever filed
Capacity queued
862 MW
requested, not committed
Already built
630 MW
5 projects connected
Built vs decided
33.3%
10 withdrawn
Median wait
5.0 yr
for applications still pending
Connected capacity
1.8 GW
indicator, see note

Source: interconnection queues published by Duke. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built5630 MW26.3%
Still waiting4862 MW21.1%
Withdrawn104.6 GW52.6%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Natural gas1575 MW
Batteries1199 MW
Solar174 MW
Other113 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
109Natural gas1.4 GWwithdrawn2011-07Duke
110Natural gas1.4 GWwithdrawn2011-07Duke
93Natural gas650 MWwithdrawn2008-08Duke
137Natural gas575 MWactive2015-11Duke
5Natural gas480 MWcompleted1999-10Duke
129Other400 MWwithdrawn2014-01Duke
77Natural gas345 MWwithdrawn2008-01Duke
116Other220 MWwithdrawn2012-01Duke
FC100009Batteries199 MWactive2024-12Duke
71Solar75 MWcompleted2020-08TEC
237Solar74 MWactive2018-07Duke
107Solar74 MWwithdrawn2023-09TEC
26Solar74 MWwithdrawn2017-04TEC
2Solar55 MWcompleted2017-04TEC
FC100000Other13 MWactive2024-12Duke

How Pasco County compares

#442 in the US · #10 in FL

Pasco County ranks #442 of 1,607 US counties by power waiting to connect, and #10 of 48 in Florida.

CountyWaitingCapacity queued
Hendry County403.0 GW
Miami-Dade County32.7 GW
Osceola County92.0 GW
St. Lucie County241.8 GW
DeSoto County161.2 GW
Collier County151.1 GW
Charlotte County141.0 GW
Martin County141.0 GW

Common questions about power in Pasco County

How long does it take to get power for a data center in Pasco County, FL?

The median wait for a project still in the interconnection queue in Pasco County is 5.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 5 projects in Pasco County have reached energization and 10 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Pasco County, FL?

862 MW is currently requested across 4 active interconnection requests, and 630 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Pasco County, FL a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Florida policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Pasco County — Duke — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Pasco County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Pasco County on the map County reports All of Florida