Data centers and new power in Manatee County, FL

683 MW of new power is waiting to connect to the grid in Manatee County, FL — 9 active requests. Typical wait: 4.6 years. 7 projects are built, 15 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Manatee County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Manatee County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Manatee County right now.

683 MW
of new power is waiting to connect
9 projects asked. Not yet approved. Roughly what 546,000 homes use.
856 MW
has actually been built
7 projects switched on so far.
4.6 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 23%
  • Still waiting 29%
  • Withdrawn 48%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Manatee County.

What kind of power is asking to connect

  • Solar 87%
  • Natural gas 13%

By capacity requested. Data as of 14 October 2026.

All the numbers

31 requests ever filed
Pending applications
9
of 31 ever filed
Capacity queued
683 MW
requested, not committed
Already built
856 MW
7 projects connected
Built vs decided
31.8%
15 withdrawn
Median wait
4.6 yr
for applications still pending
Connected capacity
4.2 GW
indicator, see note

Source: interconnection queues published by FPL. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built7856 MW22.6%
Still waiting9683 MW29.0%
Withdrawn151.1 GW48.4%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar8596 MW
Natural gas187 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
371Batteries409 MWcompleted2019-10FPL
415Natural gas87 MWactive2020-09FPL
194Solar74 MWcompleted2017-08Duke
287Solar74 MWwithdrawn2020-06Duke
298Solar74 MWwithdrawn2021-12Duke
299Solar74 MWwithdrawn2021-12Duke
191Solar74 MWactive2016-05FPL
192Solar74 MWwithdrawn2016-05FPL
361Solar74 MWcompleted2018-12FPL
362Solar74 MWcompleted2018-12FPL
363Solar74 MWwithdrawn2018-12FPL
364Solar74 MWcompleted2018-12FPL
365Solar74 MWcompleted2018-12FPL
422Solar74 MWcompleted2021-05FPL
424Solar74 MWactive2021-05FPL

How Manatee County compares

#519 in the US · #11 in FL

Manatee County ranks #519 of 1,607 US counties by power waiting to connect, and #11 of 48 in Florida.

CountyWaitingCapacity queued
Hendry County403.0 GW
Miami-Dade County32.7 GW
Osceola County92.0 GW
St. Lucie County241.8 GW
DeSoto County161.2 GW
Collier County151.1 GW
Charlotte County141.0 GW
Martin County141.0 GW

Common questions about power in Manatee County

How long does it take to get power for a data center in Manatee County, FL?

The median wait for a project still in the interconnection queue in Manatee County is 4.6 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 7 projects in Manatee County have reached energization and 15 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Manatee County, FL?

683 MW is currently requested across 9 active interconnection requests, and 856 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Manatee County, FL a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Florida policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Manatee County — FPL — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.