Data centers and new power in Hillsborough County, FL

298 MW of new power is waiting to connect to the grid in Hillsborough County, FL — 4 active requests. Typical wait: 2.0 years. 16 projects are built, 34 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Hillsborough County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Hillsborough County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Hillsborough County right now.

298 MW
of new power is waiting to connect
4 projects asked. Not yet approved. Roughly what 238,000 homes use.
900 MW
has actually been built
16 projects switched on so far.
2.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 30%
  • Still waiting 7%
  • Withdrawn 63%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Hillsborough County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

54 requests ever filed
Pending applications
4
of 54 ever filed
Capacity queued
298 MW
requested, not committed
Already built
900 MW
16 projects connected
Built vs decided
32.0%
34 withdrawn
Median wait
2.0 yr
for applications still pending
Connected capacity
5.1 GW
indicator, see note

Source: interconnection queues published by TEC. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built16900 MW29.6%
Still waiting4298 MW7.4%
Withdrawn342.2 GW63.0%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar4298 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
62Natural gas186 MWcompleted2019-08TEC
82Natural gas186 MWwithdrawn2021-11TEC
61Batteries95 MWcompleted2019-08TEC
49Solar75 MWwithdrawn2018-11TEC
65Solar75 MWwithdrawn2019-12TEC
78Solar75 MWwithdrawn2021-06TEC
79Solar75 MWwithdrawn2021-06TEC
80Solar75 MWwithdrawn2021-06TEC
81Solar75 MWwithdrawn2021-06TEC
92Solar75 MWwithdrawn2022-11TEC
95ASolar75 MWwithdrawn2022-11TEC
95BSolar75 MWwithdrawn2022-11TEC
96ASolar75 MWwithdrawn2022-11TEC
96BSolar75 MWwithdrawn2022-11TEC
101Solar74 MWactive2023-04TEC

How Hillsborough County compares

#804 in the US · #21 in FL

Hillsborough County ranks #804 of 1,607 US counties by power waiting to connect, and #21 of 48 in Florida.

CountyWaitingCapacity queued
Hendry County403.0 GW
Miami-Dade County32.7 GW
Osceola County92.0 GW
St. Lucie County241.8 GW
DeSoto County161.2 GW
Collier County151.1 GW
Charlotte County141.0 GW
Martin County141.0 GW

Common questions about power in Hillsborough County

How long does it take to get power for a data center in Hillsborough County, FL?

The median wait for a project still in the interconnection queue in Hillsborough County is 2.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 16 projects in Hillsborough County have reached energization and 34 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Hillsborough County, FL?

298 MW is currently requested across 4 active interconnection requests, and 900 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Hillsborough County, FL a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Florida policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Hillsborough County — TEC — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Hillsborough County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Hillsborough County on the map County reports All of Florida