0 MW of new power is waiting to connect to the grid in Morris County, NJ — 0 active requests. 3 projects are built, 19 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Morris County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Morris County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Morris County right now.

0 MW
of new power is waiting to connect
0 projects asked. Not yet approved.
37 MW
has actually been built
3 projects switched on so far.
19
projects gave up
Withdrawn before being built. Normal nationally.

Where every request ever filed here ended up

  • Built 14%
  • Withdrawn 86%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Morris County.

What kind of power is asking to connect

    By capacity requested. Data as of 14 October 2026.

    All the numbers

    22 requests ever filed
    Pending applications
    0
    of 22 ever filed
    Capacity queued
    0 MW
    requested, not committed
    Already built
    37 MW
    3 projects connected
    Built vs decided
    13.6%
    19 withdrawn

    Source: interconnection queues published by the transmission providers serving this county. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

    Outcome of every request filed here

    OutcomeProjectsCapacityShare
    Built337 MW13.6%
    Still waiting00 MW0.0%
    Withdrawn19186 MW86.4%
    Paused0—0.0%

    Waiting to connect, by type of power

    Key dates for projects here

    no dated windows published
    QueueWhat closesClosesStanding
    FERCFERC large-load show cause — stakeholder comments on RTO responses
    Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
    No date published yetunconfirmed source
    FERCFERC RM26-4 — generic large-load rulemaking
    Still at ANOPR stage.
    No date published yetconfirmed source
    FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
    A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
    No date published yetconfirmed source

    A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

    The biggest projects on file

    top 15 by size
    ProjectTypeCapacityStatusFiledQueue
    Mt. Hope Mine 34.5kVBiomass30 MWwithdrawn2006-06PJM
    Traynor 34.5kVSolar20 MWwithdrawn2008-10PJM
    CPV NJ SolarSolar20 MWwithdrawn2019-04PJM
    Flanders-Netcong 34.5 kVSolar20 MWwithdrawn2019-09PJM
    Greystone-West Denville 34.5 kVBatteries20 MWwithdrawn2019-09PJM
    Greystone - West Denville 34.5 kVBatteries20 MWwithdrawn2021-03PJM
    Flanders-West Wharton 34.5 kVSolar20 MWcompleted2020-03PJM
    Flanders-Saxton Fall 34kVSolar17 MWwithdrawn2011-04PJM
    Chester-Pohatcong Mountain 34.5 kVSolar15 MWcompleted2020-09PJM
    Morris 34.5kVSolar10 MWwithdrawn2009-08PJM
    Roxbury 12.5kVSolar10 MWwithdrawn2009-11PJM
    Newburgh 12kVSolar6 MWwithdrawn2010-08PJM
    Kenvil 12.5kVSolar4 MWwithdrawn2011-03PJM
    DenvilleSolar2 MWwithdrawn2010-03PJM
    Cedar Knolls 12.5 kVBatteries2 MWwithdrawn2018-03PJM

    How Morris County compares

    #1435 in the US · #19 in NJ

    Morris County ranks #1435 of 1,607 US counties by power waiting to connect, and #19 of 21 in New Jersey.

    CountyWaitingCapacity queued
    Salem County32.8 GW
    Bergen County22.0 GW
    Union County21.6 GW
    Hudson County2350 MW
    Atlantic County3308 MW
    Camden County1300 MW
    Warren County7181 MW
    Mercer County1170 MW

    Common questions about power in Morris County

    How long does it take to get power for a data center in Morris County, NJ?

    We do not yet have a median wait for Morris County. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 3 projects in Morris County have reached energization and 19 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

    How much capacity is available in Morris County, NJ?

    0 MW is currently requested across 0 active interconnection requests, and 37 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

    Is Morris County, NJ a good site for a data center?

    This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New Jersey policy page.

    Where does the data on this page come from?

    The interconnection queue published by the transmission providers serving Morris County — the utilities in this area — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.