Data centers and new power in Camden County, NJ

300 MW of new power is waiting to connect to the grid in Camden County, NJ — 1 active requests. Typical wait: 5.1 years. 9 projects are built, 36 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Camden County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Camden County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Camden County right now.

300 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 240,000 homes use.
53 MW
has actually been built
9 projects switched on so far.
5.1 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 20%
  • Still waiting 2%
  • Withdrawn 78%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Camden County.

What kind of power is asking to connect

  • Batteries 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

46 requests ever filed
Pending applications
1
of 46 ever filed
Capacity queued
300 MW
requested, not committed
Already built
53 MW
9 projects connected
Built vs decided
20.0%
36 withdrawn
Median wait
5.1 yr
for applications still pending
Connected capacity
268 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built953 MW19.6%
Still waiting1300 MW2.2%
Withdrawn362.8 GW78.3%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries1300 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Camden-Richmond 230kVNatural gas727 MWwithdrawn2000-11PJM
Camden-RichmondNatural gas640 MWwithdrawn2005-02PJM
Marion 345kVNot stated400 MWwithdrawn2014-10PJM
New Freedom - Monroe 230 kVBatteries300 MWactive2021-09PJM
New Freedom 230 kVBatteries300 MWwithdrawn2022-03PJM
CamdenNatural gas258 MWwithdrawn1999-02PJM
Gloucester 230kVNatural gas204 MWwithdrawn2006-12PJM
Silver Lake 69 kVBatteries40 MWwithdrawn2019-09PJM
Silver Lake 69 kVBatteries40 MWwithdrawn2020-08PJM
Winslow - Monroe 69kVSolar29 MWwithdrawn2021-09PJM
Gloucester 26kVNatural gas24 MWcompleted2014-04PJM
Silver Lake 69 kVBatteries20 MWwithdrawn2018-07PJM
Gloucester 230 kVBatteries20 MWwithdrawn2020-09PJM
Delair-Locust Street 69 kVSolar20 MWwithdrawn2020-08PJM
Berlin 69kVSolar18 MWwithdrawn2010-04PJM

How Camden County compares

#792 in the US · #6 in NJ

Camden County ranks #792 of 1,607 US counties by power waiting to connect, and #6 of 21 in New Jersey.

CountyWaitingCapacity queued
Salem County32.8 GW
Bergen County22.0 GW
Union County21.6 GW
Hudson County2350 MW
Atlantic County3308 MW
Warren County7181 MW
Mercer County1170 MW
Cumberland County3149 MW

Common questions about power in Camden County

How long does it take to get power for a data center in Camden County, NJ?

The median wait for a project still in the interconnection queue in Camden County is 5.1 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 9 projects in Camden County have reached energization and 36 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Camden County, NJ?

300 MW is currently requested across 1 active interconnection requests, and 53 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Camden County, NJ a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New Jersey policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Camden County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Camden County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Camden County on the map County reports All of New Jersey