Data centers and new power in Somerset County, MD

4 MW of new power is waiting to connect to the grid in Somerset County, MD — 1 active requests. Typical wait: 6.5 years. 2 projects are built, 30 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Somerset County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Somerset County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Somerset County right now.

4 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 3,000 homes use.
127 MW
has actually been built
2 projects switched on so far.
6.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 6%
  • Still waiting 3%
  • Withdrawn 91%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Somerset County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

33 requests ever filed
Pending applications
1
of 33 ever filed
Capacity queued
4 MW
requested, not committed
Already built
127 MW
2 projects connected
Built vs decided
6.2%
30 withdrawn
Median wait
6.5 yr
for applications still pending
Connected capacity
142 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built2127 MW6.1%
Still waiting14 MW3.0%
Withdrawn30733 MW90.9%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar14 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Loretto-Kings Creek 138kVWind150 MWwithdrawn2011-04PJM
Kings Creek-Loretto 138kVSolar118 MWcompleted2014-10PJM
King's Creek 138 kVSolar118 MWwithdrawn2023-03PJM
Kings Creek-Crisfield 69kVWind100 MWwithdrawn2010-11PJM
Princess Anne–Loretto 69 kVSolar59 MWwithdrawn2021-01PJM
Kings Creek 138kVBatteries30 MWwithdrawn2021-09PJM
Kingston-Westover 69kVSolar20 MWwithdrawn2012-08PJM
Somerset County 25kVBatteries20 MWwithdrawn2013-10PJM
Chestertown 69kVSolar20 MWwithdrawn2015-10PJM
Crisfield 69kVBatteries20 MWwithdrawn2021-12PJM
Kings Creek-Pocomoke 138kVBiomass20 MWwithdrawn2014-10PJM
PocomokeBiomass20 MWwithdrawn2008-01PJM
Crisfield 25kVOil12 MWwithdrawn2012-11PJM
Crisfield-Kings Creek 69kVSolar12 MWwithdrawn2017-03PJM
Kingston 12 kV IIBatteries11 MWwithdrawn2020-09PJM

How Somerset County compares

#1241 in the US · #14 in MD

Somerset County ranks #1241 of 1,607 US counties by power waiting to connect, and #14 of 22 in Maryland.

Common questions about power in Somerset County

How long does it take to get power for a data center in Somerset County, MD?

The median wait for a project still in the interconnection queue in Somerset County is 6.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Somerset County have reached energization and 30 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Somerset County, MD?

4 MW is currently requested across 1 active interconnection requests, and 127 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Somerset County, MD a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Maryland policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Somerset County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Somerset County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Somerset County on the map County reports All of Maryland