Data centers and new power in Montgomery County, MD

500 MW of new power is waiting to connect to the grid in Montgomery County, MD — 1 active requests. Typical wait: 6.0 years. 10 projects are built, 15 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Montgomery County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Montgomery County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Montgomery County right now.

500 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 400,000 homes use.
326 MW
has actually been built
10 projects switched on so far.
6.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 38%
  • Still waiting 4%
  • Withdrawn 58%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Montgomery County.

What kind of power is asking to connect

  • Batteries 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

26 requests ever filed
Pending applications
1
of 26 ever filed
Capacity queued
500 MW
requested, not committed
Already built
326 MW
10 projects connected
Built vs decided
40.0%
15 withdrawn
Median wait
6.0 yr
for applications still pending
Connected capacity
500 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built10326 MW38.5%
Still waiting1500 MW3.8%
Withdrawn152.5 GW57.7%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries1500 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
DickersonNatural gas600 MWwithdrawn2008-07PJM
Dickerson 230 kVBatteries500 MWactive2020-10PJM
Dickerson 230kVNatural gas440 MWwithdrawn2011-10PJM
Dickerson 230kVNatural gas400 MWwithdrawn2008-07PJM
DickersonNatural gas398 MWwithdrawn1999-04PJM
Dickerson 230kVNatural gas234 MWwithdrawn2001-02PJM
Dickerson H2 CT 230 kVNatural gas173 MWcompleted2020-03PJM
Dickerson 230kVNot stated155 MWwithdrawn2011-11PJM
Dickerson 230 kVBatteries150 MWwithdrawn2021-03PJM
Dickerson 120 MWNatural gas120 MWwithdrawn1997-05PJM
White OakNatural gas53 MWcompleted2010-11PJM
NIH 13kVOil25 MWcompleted2000-07PJM
White OakNatural gas24 MWcompleted2009-07PJM
Dickerson 230kVNatural gas20 MWcompleted2001-01PJM
White OakNatural gas20 MWcompleted2005-12PJM

How Montgomery County compares

#619 in the US · #4 in MD

Montgomery County ranks #619 of 1,607 US counties by power waiting to connect, and #4 of 22 in Maryland.

Common questions about power in Montgomery County

How long does it take to get power for a data center in Montgomery County, MD?

The median wait for a project still in the interconnection queue in Montgomery County is 6.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 10 projects in Montgomery County have reached energization and 15 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Montgomery County, MD?

500 MW is currently requested across 1 active interconnection requests, and 326 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Montgomery County, MD a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Maryland policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Montgomery County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Montgomery County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Montgomery County on the map County reports All of Maryland