Data centers and new power in Baltimore city, MD

135 MW of new power is waiting to connect to the grid in Baltimore city, MD — 1 active requests. Typical wait: 5.1 years. 6 projects are built, 32 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Baltimore city itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Baltimore city

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Baltimore city right now.

135 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 108,000 homes use.
184 MW
has actually been built
6 projects switched on so far.
5.1 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 15%
  • Still waiting 3%
  • Withdrawn 82%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Baltimore city.

What kind of power is asking to connect

  • Batteries 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

39 requests ever filed
Pending applications
1
of 39 ever filed
Capacity queued
135 MW
requested, not committed
Already built
184 MW
6 projects connected
Built vs decided
15.8%
32 withdrawn
Median wait
5.1 yr
for applications still pending
Connected capacity
224 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built6184 MW15.4%
Still waiting1135 MW2.6%
Withdrawn322.8 GW82.1%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries1135 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Riverside 230/115kVNatural gas600 MWwithdrawn2001-09PJM
Northeast - CP Crane 115 kVBatteries500 MWwithdrawn2023-07PJM
Steel Side 115 kVNatural gas220 MWwithdrawn2008-02PJM
C.P. Crane 115 kVBatteries200 MWwithdrawn2019-05PJM
Northeast-CP Crane 115kVBatteries200 MWwithdrawn2022-03PJM
Pumphrey 115kVBiomass157 MWwithdrawn2010-02PJM
Bethlehem Steel 33kVNatural gas152 MWcompleted2000-09PJM
Crane CT 2-3-4 115kVNatural gas145 MWwithdrawn2018-03PJM
Northeast - Riverside 230 kVBatteries135 MWactive2021-09PJM
Pumphrey 115kVOther132 MWwithdrawn2009-04PJM
RiversideNatural gas120 MWwithdrawn2007-05PJM
Northeast - Windy Edge 115 kVBatteries110 MWwithdrawn2022-09PJM
Gould St.Natural gas106 MWwithdrawn2007-07PJM
Northeast-CP Crane 115kVBatteries75 MWwithdrawn2022-09PJM
TBD 115 kVBatteries75 MWwithdrawn2022-09PJM

How Baltimore city compares

#1038 in the US · #6 in MD

Baltimore city ranks #1038 of 1,607 US counties by power waiting to connect, and #6 of 22 in Maryland.

Common questions about power in Baltimore city

How long does it take to get power for a data center in Baltimore city, MD?

The median wait for a project still in the interconnection queue in Baltimore city is 5.1 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 6 projects in Baltimore city have reached energization and 32 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Baltimore city, MD?

135 MW is currently requested across 1 active interconnection requests, and 184 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Baltimore city, MD a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Maryland policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Baltimore city — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Baltimore city

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Baltimore city on the map County reports All of Maryland