Data centers and new power in Charles County, MD

110 MW of new power is waiting to connect to the grid in Charles County, MD — 1 active requests. Typical wait: 5.5 years. 5 projects are built, 33 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Charles County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Charles County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Charles County right now.

110 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 88,000 homes use.
2.4 GW
has actually been built
5 projects switched on so far.
5.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 12%
  • Still waiting 2%
  • Withdrawn 80%
  • Paused 5%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Charles County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

41 requests ever filed
Pending applications
1
of 41 ever filed
Capacity queued
110 MW
requested, not committed
Already built
2.4 GW
5 projects connected
Built vs decided
13.2%
33 withdrawn
Median wait
5.5 yr
for applications still pending
Connected capacity
1.1 GW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built52.4 GW12.2%
Still waiting1110 MW2.4%
Withdrawn3317.6 GW80.5%
Paused2—4.9%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar1110 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Morgantown / Oak GroveNatural gas1.8 GWwithdrawn2003-05PJM
Morgantown / Oak GroveNatural gas1.8 GWwithdrawn2003-08PJM
Morgantown-Oak GroveNatural gas1.8 GWwithdrawn2004-02PJM
Kelson Ridge 230kVNatural gas1.4 GWwithdrawn2011-01PJM
Talbert 230kVNatural gas1.2 GWwithdrawn2007-03PJM
Morgantown 230 kVBatteries1.1 GWwithdrawn2023-03PJM
Burches Hill-Possum Point 500kVNatural gas971 MWwithdrawn2011-10PJM
Oakgrove-Morgantown 230kVNatural gas971 MWwithdrawn2011-10PJM
Morgantown-Oak GroveNatural gas900 MWwithdrawn2007-04PJM
Morgantown-Oak Grove 230kVNatural gas830 MWwithdrawn2011-05PJM
Kelson Ridge 230kVNatural gas820 MWcompleted2017-09PJM
Kelson Ridge 230kVNatural gas785 MWcompleted2011-11PJM
Kelson Ridge 230kVNatural gas785 MWwithdrawn2011-11PJM
Morgantown-Oak GroveNatural gas725 MWcompleted2009-08PJM
Morgantown - Oak Grove 230kVNatural gas645 MWwithdrawn2006-10PJM

How Charles County compares

#1071 in the US · #7 in MD

Charles County ranks #1071 of 1,607 US counties by power waiting to connect, and #7 of 22 in Maryland.

Common questions about power in Charles County

How long does it take to get power for a data center in Charles County, MD?

The median wait for a project still in the interconnection queue in Charles County is 5.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 5 projects in Charles County have reached energization and 33 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Charles County, MD?

110 MW is currently requested across 1 active interconnection requests, and 2.4 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Charles County, MD a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Maryland policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Charles County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Charles County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Charles County on the map County reports All of Maryland