Data centers and new power in Brazoria County, TX

11.7 GW of new power is waiting to connect to the grid in Brazoria County, TX — 55 active requests. Typical wait: 1.8 years. 23 projects are built, 25 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Brazoria County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Brazoria County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Brazoria County right now.

11.7 GW
of new power is waiting to connect
55 projects asked. Not yet approved. Roughly what 9.4 million homes use.
2.6 GW
has actually been built
23 projects switched on so far.
1.8 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 21%
  • Still waiting 50%
  • Withdrawn 23%
  • Paused 6%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Brazoria County.

What kind of power is asking to connect

  • Batteries 52%
  • Solar 26%
  • Wind 15%
  • Natural gas 7%

By capacity requested. Data as of 14 October 2026.

All the numbers

110 requests ever filed
Pending applications
55
of 110 ever filed
Capacity queued
11.7 GW
requested, not committed
Already built
2.6 GW
23 projects connected
Built vs decided
47.9%
25 withdrawn
Median wait
1.8 yr
for applications still pending
Connected capacity
6.0 GW
indicator, see note

Source: interconnection queues published by ERCOT. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built232.6 GW20.9%
Still waiting5511.7 GW50.0%
Withdrawn254.0 GW22.7%
Paused7—6.4%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries366.2 GW
Solar143.0 GW
Wind21.7 GW
Natural gas3827 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
ERCOTERCOT Batch 1 large load interconnection - applications not yet dated
Successor cycle to Batch Zero under PGRR145.
No date published yetconfirmed source
ERCOTERCOT generation interconnection — rolling
Not FERC-jurisdictional.
Open all year — no cut-offunconfirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
ERCOTTexas SB 6 - large load curtailment protocol and equipment (PURA section 39.170(a))
All new large-load interconnections must carry ERCOT-controlled curtailment equipment.
Open all year — no cut-offconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Hecate Energy Orem WindWind1.5 GWactive2027-01ERCOT
OFFERED Combined Cycle GenNatural gas520 MWwithdrawn2022-12ERCOT
Amsterdam Solar IISolar510 MWwithdrawn2021-08ERCOT
Austin Bayou SolarSolar502 MWactive2025-01ERCOT
Sugarland Power PlantNatural gas484 MWwithdrawn2019-01ERCOT
GAMAY ENERGY STORAGEBatteries419 MWactive2026-01ERCOT
Austin Bayou Solar IISolar402 MWwithdrawn2024-03ERCOT
Aldrin 345 BESSBatteries362 MWactive2025-01ERCOT
Cottonwood Bayou SolarSolar351 MWactive2019-01ERCOT
Myrtle SolarSolar321 MWactive2019-01ERCOT
Elio BESSBatteries317 MWactive2025-01ERCOT
Bulldog Power (TEF - Due Diligence)Natural gas311 MWactive2027-01ERCOT
Bulldog Power IINatural gas311 MWactive2030-01ERCOT
Royal River BESSBatteries311 MWactive2024-01ERCOT
Jarvis BESSOther308 MWcompleted2022-03ERCOT

How Brazoria County compares

#6 in the US · #2 in TX

Brazoria County ranks #6 of 1,607 US counties by power waiting to connect, and #2 of 183 in Texas.

CountyWaitingCapacity queued
Pecos County5521.2 GW
Milam County339.2 GW
Wharton County409.1 GW
Jack County188.6 GW
Hill County238.0 GW
Reeves County217.8 GW
Wilbarger County207.0 GW
Mitchell County166.9 GW

Common questions about power in Brazoria County

How long does it take to get power for a data center in Brazoria County, TX?

The median wait for a project still in the interconnection queue in Brazoria County is 1.8 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 23 projects in Brazoria County have reached energization and 25 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Brazoria County, TX?

11.7 GW is currently requested across 55 active interconnection requests, and 2.6 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Brazoria County, TX a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Texas policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Brazoria County — ERCOT — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Brazoria County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Brazoria County on the map County reports All of Texas