Data centers and new power in Durham County, NC

504 MW of new power is waiting to connect to the grid in Durham County, NC — 4 active requests. Typical wait: 1.3 years. 0 projects are built, 2 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Durham County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Durham County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Durham County right now.

504 MW
of new power is waiting to connect
4 projects asked. Not yet approved. Roughly what 403,000 homes use.
0 MW
has actually been built
0 projects switched on so far.
1.3 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 67%
  • Withdrawn 33%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Durham County.

What kind of power is asking to connect

  • Other 60%
  • Batteries 39%
  • Solar 1%

By capacity requested. Data as of 14 October 2026.

All the numbers

6 requests ever filed
Pending applications
4
of 6 ever filed
Capacity queued
504 MW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
2 withdrawn
Median wait
1.3 yr
for applications still pending
Connected capacity
19 MW
indicator, see note

Source: interconnection queues published by Duke. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting4504 MW66.7%
Withdrawn273 MW33.3%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Other2300 MW
Batteries1199 MW
Solar15 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 6 by size
ProjectTypeCapacityStatusFiledQueue
977296Batteries199 MWactive2025-06Duke
977263Other150 MWactive2025-06Duke
PP00040Other150 MWactive2025-08Duke
900495Batteries50 MWwithdrawn2023-06Duke
186310Batteries23 MWwithdrawn2021-07Duke
977895Solar5 MWactive2025-06Duke

How Durham County compares

#611 in the US · #13 in NC

Durham County ranks #611 of 1,607 US counties by power waiting to connect, and #13 of 44 in North Carolina.

CountyWaitingCapacity queued
Pinal County4610.6 GW
Person County41.9 GW
Washington County61.6 GW
Anson County31.5 GW
Davidson County21.5 GW
Wayne County231.3 GW
Stokes County31.2 GW
Richmond County7974 MW

Common questions about power in Durham County

How long does it take to get power for a data center in Durham County, NC?

The median wait for a project still in the interconnection queue in Durham County is 1.3 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Durham County have reached energization and 2 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Durham County, NC?

504 MW is currently requested across 4 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Durham County, NC a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our North Carolina policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Durham County — Duke — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.