Data centers and new power in Metcalfe County, KY

106 MW of new power is waiting to connect to the grid in Metcalfe County, KY — 1 active requests. Typical wait: 6.0 years. 2 projects are built, 9 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Metcalfe County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Metcalfe County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Metcalfe County right now.

106 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 85,000 homes use.
90 MW
has actually been built
2 projects switched on so far.
6.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 17%
  • Still waiting 8%
  • Withdrawn 75%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Metcalfe County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

12 requests ever filed
Pending applications
1
of 12 ever filed
Capacity queued
106 MW
requested, not committed
Already built
90 MW
2 projects connected
Built vs decided
18.2%
9 withdrawn
Median wait
6.0 yr
for applications still pending
Connected capacity
55 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built290 MW16.7%
Still waiting1106 MW8.3%
Withdrawn92.3 GW75.0%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar1106 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 12 by size
ProjectTypeCapacityStatusFiledQueue
132Other640 MWwithdrawn2000-11TVA
57Other640 MWwithdrawn1999-08TVA
Summer Shade 161 kVSolar331 MWwithdrawn2021-03PJM
Summer Shade - Green County 161 kVSolar250 MWwithdrawn2021-07PJM
Summer Shade-Green County 161 kVSolar150 MWwithdrawn2021-01PJM
Summer Shade 161 kVSolar106 MWactive2020-09PJM
Knob Lick 69kVSolar104 MWwithdrawn2021-07PJM
Knob Lick 69kVSolar60 MWwithdrawn2021-07PJM
Patton Rd-Summer Shade 69 kVSolar55 MWcompleted2019-09PJM
Patton Rd-Summer Shade 69 kVSolar55 MWwithdrawn2023-03PJM
Knob Lick-JB Galloway Tap 69 kVSolar50 MWwithdrawn2021-03PJM
Patton Rd-Summer Shade 69 kVSolar35 MWcompleted2019-02PJM

How Metcalfe County compares

#1074 in the US · #17 in KY

Metcalfe County ranks #1074 of 1,607 US counties by power waiting to connect, and #17 of 37 in Kentucky.

CountyWaitingCapacity queued
Jefferson County73.2 GW
Muhlenberg County61.4 GW
Trimble County9925 MW
Mercer County6922 MW
Henderson County3800 MW
Fleming County4548 MW
Mccraken3466 MW
Martin County2300 MW

Common questions about power in Metcalfe County

How long does it take to get power for a data center in Metcalfe County, KY?

The median wait for a project still in the interconnection queue in Metcalfe County is 6.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Metcalfe County have reached energization and 9 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Metcalfe County, KY?

106 MW is currently requested across 1 active interconnection requests, and 90 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Metcalfe County, KY a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Kentucky policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Metcalfe County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Metcalfe County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Metcalfe County on the map County reports All of Kentucky