Data centers and new power in Green County, WI

185 MW of new power is waiting to connect to the grid in Green County, WI — 2 active requests. Typical wait: 4.1 years. 2 projects are built, 5 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Green County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Green County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Green County right now.

185 MW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 148,000 homes use.
150 MW
has actually been built
2 projects switched on so far.
4.1 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 22%
  • Still waiting 22%
  • Withdrawn 56%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Green County.

What kind of power is asking to connect

  • Natural gas 86%
  • Not stated 14%

By capacity requested. Data as of 14 October 2026.

All the numbers

9 requests ever filed
Pending applications
2
of 9 ever filed
Capacity queued
185 MW
requested, not committed
Already built
150 MW
2 projects connected
Built vs decided
28.6%
5 withdrawn
Median wait
4.1 yr
for applications still pending

Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built2150 MW22.2%
Still waiting2185 MW22.2%
Withdrawn5610 MW55.6%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Natural gas1160 MW
Not stated125 MW

Key dates for projects here

1 dated · next closes 2027-09-10 (MISO)
QueueWhat closesClosesStanding
MISOMISO DPP-2026 Definitive Planning Phase application deadline
Attachment X of the tariff and BPM-015.
2027-09-10confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 9 by size
ProjectTypeCapacityStatusFiledQueue
Columbia-South Fond du Lac 345kVSolar300 MWwithdrawn2020-06MISO
North MonroeNatural gas160 MWactive2022-09MISO
North Monroe 138 kVSolar100 MWcompleted2020-06MISO
North Monroe 138kV SubstationSolar100 MWwithdrawn2020-06MISO
North Monroe - Albany 138kV LineWind100 MWwithdrawn2017-06MISO
Blacksmith Tap - Spring Grove 69kV LineWind60 MWwithdrawn2016-05MISO
Albany - Bass Creek 138 kV Line TapSolar50 MWwithdrawn2018-03MISO
Albany - Bass Creek 138kV LineSolar50 MWcompleted2019-04MISO
Bass Creek – Albany – North Monroe 138 kVNot stated25 MWactive2022-08MISO

How Green County compares

#956 in the US · #15 in WI

Green County ranks #956 of 1,607 US counties by power waiting to connect, and #15 of 18 in Wisconsin.

CountyWaitingCapacity queued
Kenosha County61.9 GW
Portage County61.7 GW
Walworth County41.6 GW
Dane County31.3 GW
Columbia County61.3 GW
Fond du Lac County2625 MW
Rock County5510 MW
Waushara County4330 MW

Common questions about power in Green County

How long does it take to get power for a data center in Green County, WI?

The median wait for a project still in the interconnection queue in Green County is 4.1 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Green County have reached energization and 5 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Green County, WI?

185 MW is currently requested across 2 active interconnection requests, and 150 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Green County, WI a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Wisconsin policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Green County — MISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Green County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Green County on the map County reports All of Wisconsin