Data centers and new power in Charles City County, VA

295 MW of new power is waiting to connect to the grid in Charles City County, VA — 1 active requests. Typical wait: 9.9 years. 1 projects are built, 13 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Charles City County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Charles City County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Charles City County right now.

295 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 236,000 homes use.
24 MW
has actually been built
1 projects switched on so far.
9.9 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 7%
  • Still waiting 7%
  • Withdrawn 87%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Charles City County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

15 requests ever filed
Pending applications
1
of 15 ever filed
Capacity queued
295 MW
requested, not committed
Already built
24 MW
1 projects connected
Built vs decided
7.1%
13 withdrawn
Median wait
9.9 yr
for applications still pending
Connected capacity
309 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built124 MW6.7%
Still waiting1295 MW6.7%
Withdrawn137.4 GW86.7%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar1295 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Chickahominy 500kVNatural gas1.8 GWwithdrawn2019-12PJM
Chickahominy 500kVNatural gas1.6 GWwithdrawn2016-10PJM
Chickahominy 500kVNatural gas1.1 GWwithdrawn2016-03PJM
Chickahominy 230 kVSolar570 MWwithdrawn2019-09PJM
Chickahominy - Surry 500 kVBatteries500 MWwithdrawn2021-03PJM
Chickahominy 230 kVBatteries340 MWwithdrawn2021-03PJM
AG1-543Solar325 MWwithdrawn2020-09PJM
Chickhominy-Surry 500 kVSolar325 MWwithdrawn2020-12PJM
Chickahominy 230kVSolar320 MWwithdrawn2023-03PJM
Chickahominy 230kVSolar295 MWactive2016-10PJM
Chickahominy 230 kVBatteries200 MWwithdrawn2022-04PJM
Providence Forge-Turner 115kVSolar154 MWwithdrawn2021-06PJM
Providence Forge-Turner 115kVSolar154 MWwithdrawn2023-03PJM
Chickahominy 230kVBatteries43 MWwithdrawn2021-09PJM
Providence Forge 34.5kVNatural gas24 MWcompleted2016-09PJM

How Charles City County compares

#809 in the US · #24 in VA

Charles City County ranks #809 of 1,607 US counties by power waiting to connect, and #24 of 71 in Virginia.

Common questions about power in Charles City County

How long does it take to get power for a data center in Charles City County, VA?

The median wait for a project still in the interconnection queue in Charles City County is 9.9 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Charles City County have reached energization and 13 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Charles City County, VA?

295 MW is currently requested across 1 active interconnection requests, and 24 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Charles City County, VA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Virginia policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Charles City County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Charles City County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Charles City County on the map County reports All of Virginia