Data centers and new power in Box Elder County, UT

765 MW of new power is waiting to connect to the grid in Box Elder County, UT — 5 active requests. Typical wait: 2.2 years. 3 projects are built, 50 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Box Elder County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Box Elder County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Box Elder County right now.

765 MW
of new power is waiting to connect
5 projects asked. Not yet approved. Roughly what 612,000 homes use.
82 MW
has actually been built
3 projects switched on so far.
2.2 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 5%
  • Still waiting 8%
  • Withdrawn 83%
  • Paused 3%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Box Elder County.

What kind of power is asking to connect

  • Nuclear 65%
  • Wind 12%
  • Solar 12%
  • Batteries 10%

By capacity requested. Data as of 14 October 2026.

All the numbers

60 requests ever filed
Pending applications
5
of 60 ever filed
Capacity queued
765 MW
requested, not committed
Already built
82 MW
3 projects connected
Built vs decided
5.7%
50 withdrawn
Median wait
2.2 yr
for applications still pending
Connected capacity
195 MW
indicator, see note

Source: interconnection queues published by IP, PacifiCorp. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built382 MW5.0%
Still waiting5765 MW8.3%
Withdrawn504.9 GW83.3%
Paused2—3.3%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Nuclear1500 MW
Wind195 MW
Solar290 MW
Batteries180 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
1167Batteries650 MWwithdrawn2019-09PacifiCorp
978Solar525 MWwithdrawn2017-11PacifiCorp
T2-013Nuclear500 MWactive2025-08PacifiCorp
1166Batteries400 MWwithdrawn2019-09PacifiCorp
C3-045Solar300 MWwithdrawn2023-05PacifiCorp
C3-133Solar300 MWwithdrawn2023-05PacifiCorp
980Solar200 MWwithdrawn2017-11PacifiCorp
C1-17Solar199 MWwithdrawn2021-05PacifiCorp
C2-130Solar199 MWwithdrawn2022-05PacifiCorp
C2-30Solar199 MWwithdrawn2022-04PacifiCorp
C3-026Batteries199 MWwithdrawn2023-05PacifiCorp
751Solar180 MWwithdrawn2016-05PacifiCorp
C2-84Solar150 MWwithdrawn2022-05PacifiCorp
74Wind115 MWwithdrawn2006-04PacifiCorp
977Solar100 MWwithdrawn2017-11PacifiCorp

How Box Elder County compares

#484 in the US · #9 in UT

Box Elder County ranks #484 of 1,607 US counties by power waiting to connect, and #9 of 21 in Utah.

CountyWaitingCapacity queued
Miller276.5 GW
Utah County296.0 GW
Emery County193.5 GW
Juab County153.2 GW
Salt Lake County112.3 GW
Iron County111.8 GW
Kane County31.1 GW
Washington County4780 MW

Common questions about power in Box Elder County

How long does it take to get power for a data center in Box Elder County, UT?

The median wait for a project still in the interconnection queue in Box Elder County is 2.2 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 3 projects in Box Elder County have reached energization and 50 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Box Elder County, UT?

765 MW is currently requested across 5 active interconnection requests, and 82 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Box Elder County, UT a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Utah policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Box Elder County — IP, PacifiCorp — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Box Elder County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Box Elder County on the map County reports All of Utah