Data centers and new power in Kent County, RI
0 MW of new power is waiting to connect to the grid in Kent County, RI — 0 active requests. 2 projects are built, 14 withdrawn. Data as of 14 October 2026.
Is one near your house?
We have not mapped a large AI data center inside Kent County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.
What is happening with electricity in Kent County
Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Kent County right now.
Where every request ever filed here ended up
Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Kent County.
What kind of power is asking to connect
By capacity requested. Data as of 14 October 2026.
All the numbers
16 requests ever filed
Source: interconnection queues published by the transmission providers serving this county. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.
Outcome of every request filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 2 | 51 MW | 12.5% |
| Still waiting | 0 | 0 MW | 0.0% |
| Withdrawn | 14 | 435 MW | 87.5% |
| Paused | 0 | — | 0.0% |
Waiting to connect, by type of power
Key dates for projects here
no dated windows published
| Queue | What closes | Closes | Standing |
|---|---|---|---|
| FERC | FERC large-load show cause — stakeholder comments on RTO responses Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70… | No date published yet | unconfirmed source |
| FERC | FERC RM26-4 — generic large-load rulemaking Still at ANOPR stage. | No date published yet | confirmed source |
| FERC | Georgia PSC - Georgia Power must file large-load contracts 30 days before execution A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed. | No date published yet | confirmed source |
A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.
The biggest projects on file
top 15 by size
| Project | Type | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Battery Storage | Batteries | 200 MW | withdrawn | 2021-03 | ISONE |
| Battery Storage | Batteries | 63 MW | withdrawn | 2022-03 | ISONE |
| Kent County - NG WRI DG Area Study #2 >5 MW | Solar | 50 MW | withdrawn | 2020-08 | ISONE |
| Battery Storage | Batteries | 40 MW | withdrawn | 2022-10 | ISONE |
| University Solar | Solar | 31 MW | completed | 2017-11 | ISONE |
| Kent County Substation - Western RI DER Study #3 | Solar | 22 MW | withdrawn | 2024-08 | ISONE |
| Solar | Solar | 20 MW | completed | 2019-02 | ISONE |
| Kent County - NG WRI DG Area Study #2 <5 MW | Solar | 14 MW | withdrawn | 2020-08 | ISONE |
| Kent County Substation - NG Western RI DG Area Study | Solar | 10 MW | withdrawn | 2020-03 | ISONE |
| Solar | Solar | 10 MW | withdrawn | 2019-02 | ISONE |
| Warren Substation – NG RI-Warren-20-Comp-1 Study | Solar | 7 MW | withdrawn | 2020-08 | ISONE |
| Drumrock - NG WRI DG Area Study #2 <5 MW | Solar | 5 MW | withdrawn | 2020-08 | ISONE |
| New London - NG WRI DG Area Study #2 <5 MW | Solar | 5 MW | withdrawn | 2020-08 | ISONE |
| Drumrock - NG Western RI DG Area Study | Solar | 4 MW | withdrawn | 2020-03 | ISONE |
| Hopkins Hill - NG WRI DG Area Study #2 <5 MW | Solar | 4 MW | withdrawn | 2020-08 | ISONE |
How Kent County compares
#1534 in the US · #2 in RI
Kent County ranks #1534 of 1,607 US counties by power waiting to connect, and #2 of 4 in Rhode Island.
| County | Waiting | Capacity queued |
|---|---|---|
| Washington County | 1 | 205 MW |
| Newport County | 0 | 0 MW |
| Providence County | 0 | 0 MW |
Common questions about power in Kent County
How long does it take to get power for a data center in Kent County, RI?
We do not yet have a median wait for Kent County. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Kent County have reached energization and 14 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.
How much capacity is available in Kent County, RI?
0 MW is currently requested across 0 active interconnection requests, and 51 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.
Is Kent County, RI a good site for a data center?
This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Rhode Island policy page.
Where does the data on this page come from?
The interconnection queue published by the transmission providers serving Kent County — the utilities in this area — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.
Go deeper on Kent County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open Kent County on the map County reports All of Rhode Island