Data centers and new power in Malheur County, OR

604 MW of new power is waiting to connect to the grid in Malheur County, OR — 2 active requests. Typical wait: 3.6 years. 14 projects are built, 54 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Malheur County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Malheur County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Malheur County right now.

604 MW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 483,000 homes use.
112 MW
has actually been built
14 projects switched on so far.
3.6 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 20%
  • Still waiting 3%
  • Withdrawn 76%
  • Paused 1%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Malheur County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

71 requests ever filed
Pending applications
2
of 71 ever filed
Capacity queued
604 MW
requested, not committed
Already built
112 MW
14 projects connected
Built vs decided
20.6%
54 withdrawn
Median wait
3.6 yr
for applications still pending
Connected capacity
110 MW
indicator, see note

Source: interconnection queues published by IP. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built14112 MW19.7%
Still waiting2604 MW2.8%
Withdrawn542.0 GW76.1%
Paused1—1.4%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar2604 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
215Natural gas650 MWwithdrawn2007-12IP
622Solar600 MWactive2021-10IP
225Natural gas325 MWwithdrawn2007-12IP
701Batteries300 MWwithdrawn2023-02IP
736Batteries100 MWwithdrawn2023-09IP
125Natural gas90 MWwithdrawn2005-04IP
562Solar42 MWsuspended2019-08IP
733Solar40 MWwithdrawn2023-08IP
179Geothermal36 MWcompleted2006-10IP
536Solar23 MWwithdrawn2018-06IP
287Other20 MWwithdrawn2009-04IP
290Other20 MWwithdrawn2009-05IP
316Solar20 MWwithdrawn2010-02IP
319Solar20 MWwithdrawn2010-03IP
328Other20 MWwithdrawn2010-04IP

How Malheur County compares

#553 in the US · #14 in OR

Malheur County ranks #553 of 1,607 US counties by power waiting to connect, and #14 of 31 in Oregon.

CountyWaitingCapacity queued
Sherman County2611.4 GW
Wasco County188.6 GW
Morrow County226.6 GW
Crook County316.3 GW
Klamath County135.0 GW
Jefferson County214.2 GW
Umatilla County163.5 GW
Gilliam County143.2 GW

Common questions about power in Malheur County

How long does it take to get power for a data center in Malheur County, OR?

The median wait for a project still in the interconnection queue in Malheur County is 3.6 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 14 projects in Malheur County have reached energization and 54 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Malheur County, OR?

604 MW is currently requested across 2 active interconnection requests, and 112 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Malheur County, OR a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Oregon policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Malheur County — IP — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Malheur County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Malheur County on the map County reports All of Oregon