Data centers and new power in Baker County, OR

425 MW of new power is waiting to connect to the grid in Baker County, OR — 2 active requests. Typical wait: 2.3 years. 9 projects are built, 37 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Baker County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Baker County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Baker County right now.

425 MW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 340,000 homes use.
291 MW
has actually been built
9 projects switched on so far.
2.3 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 19%
  • Still waiting 4%
  • Withdrawn 77%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Baker County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

48 requests ever filed
Pending applications
2
of 48 ever filed
Capacity queued
425 MW
requested, not committed
Already built
291 MW
9 projects connected
Built vs decided
19.6%
37 withdrawn
Median wait
2.3 yr
for applications still pending
Connected capacity
261 MW
indicator, see note

Source: interconnection queues published by IP. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built9291 MW18.8%
Still waiting2425 MW4.2%
Withdrawn371.6 GW77.1%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar2425 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
771Solar325 MWactive2025-04IP
734Solar240 MWwithdrawn2023-09IP
735Solar225 MWwithdrawn2023-09IP
757Hydro220 MWcompleted2025-03IP
251Wind215 MWwithdrawn2008-04IP
74Wind202 MWwithdrawn2002-04IP
209Wind200 MWwithdrawn2007-11IP
727Batteries200 MWwithdrawn2023-06IP
732Solar100 MWactive2023-08IP
738Solar80 MWwithdrawn2023-10IP
507Solar15 MWwithdrawn2015-10IP
519Solar15 MWcompleted2016-10IP
508Solar12 MWwithdrawn2015-10IP
495Solar11 MWwithdrawn2015-05IP
197Wind10 MWwithdrawn2007-07IP

How Baker County compares

#683 in the US · #17 in OR

Baker County ranks #683 of 1,607 US counties by power waiting to connect, and #17 of 31 in Oregon.

CountyWaitingCapacity queued
Sherman County2611.4 GW
Wasco County188.6 GW
Morrow County226.6 GW
Crook County316.3 GW
Klamath County135.0 GW
Jefferson County214.2 GW
Umatilla County163.5 GW
Gilliam County143.2 GW

Common questions about power in Baker County

How long does it take to get power for a data center in Baker County, OR?

The median wait for a project still in the interconnection queue in Baker County is 2.3 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 9 projects in Baker County have reached energization and 37 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Baker County, OR?

425 MW is currently requested across 2 active interconnection requests, and 291 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Baker County, OR a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Oregon policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Baker County — IP — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Baker County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Baker County on the map County reports All of Oregon