Data centers and new power in Jasper County, MO

250 MW of new power is waiting to connect to the grid in Jasper County, MO — 2 active requests. Typical wait: 4.8 years. 0 projects are built, 16 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Jasper County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Jasper County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Jasper County right now.

250 MW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 200,000 homes use.
0 MW
has actually been built
0 projects switched on so far.
4.8 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 11%
  • Withdrawn 89%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Jasper County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

18 requests ever filed
Pending applications
2
of 18 ever filed
Capacity queued
250 MW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
16 withdrawn
Median wait
4.8 yr
for applications still pending
Connected capacity
1.1 GW
indicator, see note

Source: interconnection queues published by SPP. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting2250 MW11.1%
Withdrawn162.9 GW88.9%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar2250 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
SPPSPP 2028 CPP Interconnection Cluster Study (ICS) application window
Definitive Interconnection System Impact Study cluster, post Order 2023 compliance.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
GEN-2003-011Natural gas600 MWwithdrawn2003-07SPP
GEN-2003-007Coal550 MWwithdrawn2003-07SPP
GI-94Solar225 MWwithdrawn2020-12AEC
GEN-2017-189Solar202 MWwithdrawn2017-11SPP
GI-68Solar200 MWwithdrawn2018-05AEC
GEN-2023-226Batteries200 MWwithdrawn2023-10SPP
GEN-2020-088Solar150 MWactive2020-04SPP
GEN-2009-027Wind150 MWwithdrawn2009-07SPP
GEN-2009-028Wind150 MWwithdrawn2009-07SPP
GEN-2023-017Batteries150 MWwithdrawn2023-10SPP
GEN-2021-059Solar130 MWwithdrawn2021-04SPP
GEN-2023-061Solar100 MWactive2023-10SPP
GEN-2018-053Wind100 MWwithdrawn2018-05SPP
GI-45Wind80 MWwithdrawn2011-02AEC
GEN-2023-233Batteries75 MWwithdrawn2023-10SPP

How Jasper County compares

#848 in the US · #15 in MO

Jasper County ranks #848 of 1,607 US counties by power waiting to connect, and #15 of 26 in Missouri.

CountyWaitingCapacity queued
Randolph County133.5 GW
Clinton County41.4 GW
Jackson County8869 MW
Clay County6860 MW
Macon County3608 MW
Bollinger County3600 MW
Nodaway County2468 MW
New Madrid County6462 MW

Common questions about power in Jasper County

How long does it take to get power for a data center in Jasper County, MO?

The median wait for a project still in the interconnection queue in Jasper County is 4.8 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Jasper County have reached energization and 16 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Jasper County, MO?

250 MW is currently requested across 2 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Jasper County, MO a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Missouri policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Jasper County — SPP — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Jasper County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Jasper County on the map County reports All of Missouri