Data centers and new power in Randolph County, MO

3.5 GW of new power is waiting to connect to the grid in Randolph County, MO — 13 active requests. Typical wait: 6.2 years. 2 projects are built, 6 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Randolph County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Randolph County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Randolph County right now.

3.5 GW
of new power is waiting to connect
13 projects asked. Not yet approved. Roughly what 2.8 million homes use.
1.5 GW
has actually been built
2 projects switched on so far.
6.2 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 10%
  • Still waiting 62%
  • Withdrawn 29%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Randolph County.

What kind of power is asking to connect

  • Wind 43%
  • Natural gas 39%
  • Solar 13%
  • Solar + battery 3%
  • Coal 2%

By capacity requested. Data as of 14 October 2026.

All the numbers

21 requests ever filed
Pending applications
13
of 21 ever filed
Capacity queued
3.5 GW
requested, not committed
Already built
1.5 GW
2 projects connected
Built vs decided
25.0%
6 withdrawn
Median wait
6.2 yr
for applications still pending
Connected capacity
1.2 GW
indicator, see note

Source: interconnection queues published by AEC, MISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built21.5 GW9.5%
Still waiting133.5 GW61.9%
Withdrawn61.7 GW28.6%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Wind21.5 GW
Natural gas31.4 GW
Solar3445 MW
Solar + battery1115 MW
Coal480 MW

Key dates for projects here

1 dated · next closes 2027-09-10 (MISO)
QueueWhat closesClosesStanding
MISOMISO DPP-2026 Definitive Planning Phase application deadline
Attachment X of the tariff and BPM-015.
2027-09-10confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
GI-83Wind1.0 GWactive2019-06AEC
McCredie - Montgomery 345 kV Line TapNot stated1.0 GWcompleted2019-04MISO
McCredie - Montgomery 345 kV Line TapNot stated500 MWcompleted2019-04MISO
GI-113Wind500 MWwithdrawn2023-01AEC
GI-114Wind500 MWwithdrawn2023-01AEC
GI-122Wind500 MWactive2024-05AEC
GI-121Natural gas460 MWactive2024-05AEC
GI-126Natural gas460 MWactive2025-01AEC
GI-131Natural gas460 MWactive2025-07AEC
GI-120Solar245 MWactive2024-04AEC
5MOBERLY - SALSBRY5 (KCPL) 161.0kVWind200 MWwithdrawn2024-04MISO
5MOBERLY - 5OVERTON 161.0kVSolar200 MWwithdrawn2024-04MISO
GI-87Solar160 MWwithdrawn2019-10AEC
5ADAIR - 5THMHIL (AECI) 161.0kVSolar120 MWwithdrawn2024-04MISO
5ADAIR - 5THMHIL (AECI) 161.0kVSolar + battery115 MWactive2022-09MISO

How Randolph County compares

#89 in the US · #1 in MO

Randolph County ranks #89 of 1,607 US counties by power waiting to connect, and #1 of 26 in Missouri.

CountyWaitingCapacity queued
Clinton County41.4 GW
Jackson County8869 MW
Clay County6860 MW
Macon County3608 MW
Bollinger County3600 MW
Nodaway County2468 MW
New Madrid County6462 MW
Stoddard County2425 MW

Common questions about power in Randolph County

How long does it take to get power for a data center in Randolph County, MO?

The median wait for a project still in the interconnection queue in Randolph County is 6.2 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Randolph County have reached energization and 6 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Randolph County, MO?

3.5 GW is currently requested across 13 active interconnection requests, and 1.5 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Randolph County, MO a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Missouri policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Randolph County — AEC, MISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Randolph County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Randolph County on the map County reports All of Missouri