Data centers and new power in Cass County, MO

280 MW of new power is waiting to connect to the grid in Cass County, MO — 1 active requests. Typical wait: 1.6 years. 1 projects are built, 8 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Cass County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Cass County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Cass County right now.

280 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 224,000 homes use.
72 MW
has actually been built
1 projects switched on so far.
1.6 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 10%
  • Still waiting 10%
  • Withdrawn 80%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Cass County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

10 requests ever filed
Pending applications
1
of 10 ever filed
Capacity queued
280 MW
requested, not committed
Already built
72 MW
1 projects connected
Built vs decided
11.1%
8 withdrawn
Median wait
1.6 yr
for applications still pending
Connected capacity
1.1 GW
indicator, see note

Source: interconnection queues published by SPP. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built172 MW10.0%
Still waiting1280 MW10.0%
Withdrawn8995 MW80.0%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar1280 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
SPPSPP 2028 CPP Interconnection Cluster Study (ICS) application window
Definitive Interconnection System Impact Study cluster, post Order 2023 compliance.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 10 by size
ProjectTypeCapacityStatusFiledQueue
GEN-2024-170Solar280 MWactive2025-03SPP
GEN-2022-164Batteries200 MWwithdrawn2023-02SPP
GEN-2023-087Solar200 MWwithdrawn2023-10SPP
GEN-2024-275Solar150 MWwithdrawn2025-03SPP
GEN-2022-213Solar120 MWwithdrawn2023-03SPP
GEN-2017-186Solar100 MWwithdrawn2017-11SPP
GEN-2024-256Batteries100 MWwithdrawn2025-03SPP
GEN-2010-022Wind75 MWwithdrawn2010-03SPP
GEN-2008-129Natural gas72 MWcompleted2008-12SPP
GEN-2018-121Batteries50 MWwithdrawn2018-11SPP

How Cass County compares

#816 in the US · #13 in MO

Cass County ranks #816 of 1,607 US counties by power waiting to connect, and #13 of 26 in Missouri.

CountyWaitingCapacity queued
Randolph County133.5 GW
Clinton County41.4 GW
Jackson County8869 MW
Clay County6860 MW
Macon County3608 MW
Bollinger County3600 MW
Nodaway County2468 MW
New Madrid County6462 MW

Common questions about power in Cass County

How long does it take to get power for a data center in Cass County, MO?

The median wait for a project still in the interconnection queue in Cass County is 1.6 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Cass County have reached energization and 8 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Cass County, MO?

280 MW is currently requested across 1 active interconnection requests, and 72 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Cass County, MO a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Missouri policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Cass County — SPP — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Cass County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Cass County on the map County reports All of Missouri