Data centers and new power in Iberville Parish, LA

1.7 GW of new power is waiting to connect to the grid in Iberville Parish, LA — 3 active requests. Typical wait: 1.0 years. 3 projects are built, 8 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Iberville Parish itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Iberville Parish

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Iberville Parish right now.

1.7 GW
of new power is waiting to connect
3 projects asked. Not yet approved. Roughly what 1.3 million homes use.
1.1 GW
has actually been built
3 projects switched on so far.
1.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 21%
  • Still waiting 21%
  • Withdrawn 57%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Iberville Parish.

What kind of power is asking to connect

  • Natural gas 90%
  • Solar 10%

By capacity requested. Data as of 14 October 2026.

All the numbers

14 requests ever filed
Pending applications
3
of 14 ever filed
Capacity queued
1.7 GW
requested, not committed
Already built
1.1 GW
3 projects connected
Built vs decided
27.3%
8 withdrawn
Median wait
1.0 yr
for applications still pending
Connected capacity
2.7 GW
indicator, see note

Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built31.1 GW21.4%
Still waiting31.7 GW21.4%
Withdrawn83.6 GW57.1%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Natural gas21.5 GW
Solar1175 MW

Key dates for projects here

1 dated · next closes 2027-09-10 (MISO)
QueueWhat closesClosesStanding
MISOMISO DPP-2026 Definitive Planning Phase application deadline
Attachment X of the tariff and BPM-015.
2027-09-10confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 14 by size
ProjectTypeCapacityStatusFiledQueue
DONALDSONVILLE - EVERGREEN 230.0kVNatural gas1.3 GWwithdrawn2025-10MISO
WEBRENatural gas755 MWactive2025-10MISO
WEBRENatural gas755 MWactive2025-10MISO
Bayou Labutte 500kV SubstationNatural gas725 MWcompleted2019-04MISO
Commodore 500 kV Substation,Natural gas710 MWwithdrawn2025-09MISO
WILLOW GLEN 230 SWYDNatural gas707 MWwithdrawn2025-10MISO
Webre 500 kV SubstationSolar300 MWwithdrawn2018-03MISO
Derrick 230 kV SubstationSolar200 MWwithdrawn2018-03MISO
Derrick 230 kVSolar200 MWcompleted2021-08MISO
Donaldsonville - Evergreen 230 kVSolar194 MWwithdrawn2020-06MISO
Donaldsonville - Evergreen 230kVSolar175 MWcompleted2020-06MISO
DONALDSONVILLE - EVERGREEN 230.0kVSolar175 MWactive2025-11MISO
Derrick 230 kVSolar100 MWwithdrawn2021-08MISO
Donaldsonville - Evergreen 230 kVSolar50 MWwithdrawn2021-12MISO

How Iberville Parish compares

#230 in the US · #2 in LA

Iberville Parish ranks #230 of 1,607 US counties by power waiting to connect, and #2 of 31 in Louisiana.

Common questions about power in Iberville Parish

How long does it take to get power for a data center in Iberville Parish, LA?

The median wait for a project still in the interconnection queue in Iberville Parish is 1.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 3 projects in Iberville Parish have reached energization and 8 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Iberville Parish, LA?

1.7 GW is currently requested across 3 active interconnection requests, and 1.1 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Iberville Parish, LA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Louisiana policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Iberville Parish — MISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Iberville Parish

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Iberville Parish on the map County reports All of Louisiana