Data centers and new power in Bartow County, GA

3.6 GW of new power is waiting to connect to the grid in Bartow County, GA — 7 active requests. Typical wait: 2.6 years. 0 projects are built, 9 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Bartow County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Bartow County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Bartow County right now.

3.6 GW
of new power is waiting to connect
7 projects asked. Not yet approved. Roughly what 2.9 million homes use.
0 MW
has actually been built
0 projects switched on so far.
2.6 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 41%
  • Withdrawn 53%
  • Paused 6%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Bartow County.

What kind of power is asking to connect

  • Natural gas 80%
  • Batteries 14%
  • Solar 6%

By capacity requested. Data as of 14 October 2026.

All the numbers

17 requests ever filed
Pending applications
7
of 17 ever filed
Capacity queued
3.6 GW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
9 withdrawn
Median wait
2.6 yr
for applications still pending
Connected capacity
3.6 GW
indicator, see note

Source: interconnection queues published by SOCO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting73.6 GW41.2%
Withdrawn91.4 GW52.9%
Paused1—5.9%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Natural gas42.9 GW
Batteries2500 MW
Solar1200 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
IC-1255Natural gas722 MWactive2024-03SOCO
IC-1256Natural gas722 MWactive2024-03SOCO
IC-1257Natural gas722 MWactive2024-03SOCO
IC-1258Natural gas722 MWactive2024-03SOCO
IC-1245Batteries575 MWwithdrawn2024-03SOCO
IC-1144Batteries260 MWsuspended2023-06SOCO
25-IC-1313Batteries250 MWactive2025-04SOCO
IC-1222Batteries250 MWactive2023-12SOCO
IC-1119Batteries200 MWwithdrawn2023-02SOCO
IC-827Batteries200 MWwithdrawn2019-10SOCO
IC-868Solar200 MWactive2020-05SOCO
IC-1130Batteries100 MWwithdrawn2023-03SOCO
IC-828Batteries100 MWwithdrawn2019-10SOCO
IC-934Batteries100 MWwithdrawn2020-12SOCO
IC-935Batteries100 MWwithdrawn2020-12SOCO

How Bartow County compares

#86 in the US · #2 in GA

Bartow County ranks #86 of 1,607 US counties by power waiting to connect, and #2 of 61 in Georgia.

CountyWaitingCapacity queued
Heard County74.2 GW
Coweta County62.6 GW
Mitchell County62.4 GW
Monroe County12.0 GW
Hancock County42.0 GW
Effingham County131.9 GW
Sumter County51.4 GW
Laurens County71.3 GW

Common questions about power in Bartow County

How long does it take to get power for a data center in Bartow County, GA?

The median wait for a project still in the interconnection queue in Bartow County is 2.6 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Bartow County have reached energization and 9 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Bartow County, GA?

3.6 GW is currently requested across 7 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Bartow County, GA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Georgia policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Bartow County — SOCO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Bartow County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Bartow County on the map County reports All of Georgia