Data centers and new power in Solano County, CA

1.4 GW of new power is waiting to connect to the grid in Solano County, CA — 7 active requests. Typical wait: 8.5 years. 4 projects are built, 30 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Solano County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Solano County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Solano County right now.

1.4 GW
of new power is waiting to connect
7 projects asked. Not yet approved. Roughly what 1.1 million homes use.
628 MW
has actually been built
4 projects switched on so far.
8.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 10%
  • Still waiting 17%
  • Withdrawn 73%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Solano County.

What kind of power is asking to connect

  • Batteries 85%
  • Solar + battery 8%
  • Wind 6%

By capacity requested. Data as of 14 October 2026.

All the numbers

41 requests ever filed
Pending applications
7
of 41 ever filed
Capacity queued
1.4 GW
requested, not committed
Already built
628 MW
4 projects connected
Built vs decided
11.8%
30 withdrawn
Median wait
8.5 yr
for applications still pending
Connected capacity
1.5 GW
indicator, see note

Source: interconnection queues published by CAISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built4628 MW9.8%
Still waiting71.4 GW17.1%
Withdrawn307.2 GW73.2%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries41.2 GW
Solar + battery2116 MW
Wind191 MW

Key dates for projects here

1 dated · next closes 2026-10-15 (CAISO)
QueueWhat closesClosesStanding
CAISOCAISO Cluster 16 interconnection request window
Interconnection requests submitted through the GRIP portal.
2026-10-15confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Withdrawn projectBatteries900 MWwithdrawn2020-04CAISO
Withdrawn projectNatural gas730 MWwithdrawn2008-06CAISO
Withdrawn projectBatteries700 MWwithdrawn2021-04CAISO
Withdrawn projectNatural gas630 MWwithdrawn2007-11CAISO
Withdrawn projectNatural gas575 MWwithdrawn2007-09CAISO
Withdrawn projectWind500 MWwithdrawn2007-02CAISO
TOLENASBatteries400 MWactive2021-04CAISO
CORBY 2Batteries400 MWactive2021-04CAISO
Withdrawn projectBatteries400 MWwithdrawn2021-04CAISO
Withdrawn projectNatural gas391 MWwithdrawn2007-10CAISO
Withdrawn projectNatural gas390 MWwithdrawn2008-05CAISO
Withdrawn projectSolar + battery350 MWwithdrawn2019-04CAISO
CORBYBatteries300 MWactive2016-05CAISO
Withdrawn projectWind250 MWwithdrawn2011-03CAISO
SHILOH IIIWind200 MWcompleted2004-11CAISO

How Solano County compares

#269 in the US · #15 in CA

Solano County ranks #269 of 1,607 US counties by power waiting to connect, and #15 of 42 in California.

CountyWaitingCapacity queued
Los Angeles County3214.7 GW
Kern County5113.8 GW
Riverside County227.8 GW
San Bernardino County197.3 GW
Fresno County286.5 GW
Imperial County346.4 GW
Sacramento County163.6 GW
Kings County82.5 GW

Common questions about power in Solano County

How long does it take to get power for a data center in Solano County, CA?

The median wait for a project still in the interconnection queue in Solano County is 8.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 4 projects in Solano County have reached energization and 30 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Solano County, CA?

1.4 GW is currently requested across 7 active interconnection requests, and 628 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Solano County, CA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our California policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Solano County — CAISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Solano County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Solano County on the map County reports All of California