Data centers and new power in Sacramento County, CA

3.6 GW of new power is waiting to connect to the grid in Sacramento County, CA — 16 active requests. Typical wait: 4.3 years. 0 projects are built, 19 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Sacramento County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Sacramento County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Sacramento County right now.

3.6 GW
of new power is waiting to connect
16 projects asked. Not yet approved. Roughly what 2.9 million homes use.
0 MW
has actually been built
0 projects switched on so far.
4.3 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 46%
  • Withdrawn 54%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Sacramento County.

What kind of power is asking to connect

  • Solar 50%
  • Batteries 32%
  • Other 18%

By capacity requested. Data as of 14 October 2026.

All the numbers

35 requests ever filed
Pending applications
16
of 35 ever filed
Capacity queued
3.6 GW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
19 withdrawn
Median wait
4.3 yr
for applications still pending
Connected capacity
1.8 GW
indicator, see note

Source: interconnection queues published by CAISO, SMUD. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting163.6 GW45.7%
Withdrawn194.0 GW54.3%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar61.8 GW
Batteries81.2 GW
Other2650 MW

Key dates for projects here

1 dated · next closes 2026-10-15 (CAISO)
QueueWhat closesClosesStanding
CAISOCAISO Cluster 16 interconnection request window
Interconnection requests submitted through the GRIP portal.
2026-10-15confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
20Solar550 MWactive2022-07SMUD
2Solar400 MWwithdrawn2019-10SMUD
SC1Q31Other400 MWactive2025-07SMUD
9Solar360 MWwithdrawn2021-03SMUD
8Solar344 MWactive2021-01SMUD
26Solar275 MWactive2022-09SMUD
12Solar250 MWactive2021-05SMUD
23Batteries250 MWwithdrawn2022-08SMUD
24Batteries250 MWwithdrawn2022-08SMUD
28Batteries250 MWwithdrawn2022-11SMUD
3Solar250 MWactive2020-02SMUD
4Solar250 MWwithdrawn2020-06SMUD
5Solar250 MWwithdrawn2020-11SMUD
SC1Q33Other250 MWactive2025-07SMUD
21Batteries230 MWwithdrawn2022-07SMUD

How Sacramento County compares

#84 in the US · #7 in CA

Sacramento County ranks #84 of 1,607 US counties by power waiting to connect, and #7 of 42 in California.

CountyWaitingCapacity queued
Los Angeles County3214.7 GW
Kern County5113.8 GW
Riverside County227.8 GW
San Bernardino County197.3 GW
Fresno County286.5 GW
Imperial County346.4 GW
Kings County82.5 GW
Merced County102.5 GW

Common questions about power in Sacramento County

How long does it take to get power for a data center in Sacramento County, CA?

The median wait for a project still in the interconnection queue in Sacramento County is 4.3 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Sacramento County have reached energization and 19 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Sacramento County, CA?

3.6 GW is currently requested across 16 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Sacramento County, CA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our California policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Sacramento County — CAISO, SMUD — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Sacramento County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Sacramento County on the map County reports All of California