Data centers and new power in Genesee County, NY

926 MW of new power is waiting to connect to the grid in Genesee County, NY — 4 active requests. Typical wait: 7.1 years. 1 projects are built, 16 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Genesee County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Genesee County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Genesee County right now.

926 MW
of new power is waiting to connect
4 projects asked. Not yet approved. Roughly what 741,000 homes use.
280 MW
has actually been built
1 projects switched on so far.
7.1 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 5%
  • Still waiting 19%
  • Withdrawn 76%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Genesee County.

What kind of power is asking to connect

  • Solar 68%
  • Batteries 18%
  • Wind 14%

By capacity requested. Data as of 14 October 2026.

All the numbers

21 requests ever filed
Pending applications
4
of 21 ever filed
Capacity queued
926 MW
requested, not committed
Already built
280 MW
1 projects connected
Built vs decided
5.9%
16 withdrawn
Median wait
7.1 yr
for applications still pending
Connected capacity
148 MW
indicator, see note

Source: interconnection queues published by NYISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built1280 MW4.8%
Still waiting4926 MW19.0%
Withdrawn161.9 GW76.2%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar2630 MW
Batteries1170 MW
Wind1126 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
NYISONYISO cluster request window
Class Year deliverability construct plus the new cluster process.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Cider SolarSolar500 MWactive2019-04NYISO
Genesee Wind FarmWind500 MWwithdrawn2005-01NYISO
GenWy Wind FarmWind478 MWwithdrawn2005-10NYISO
Excelsior Energy CenterSolar280 MWcompleted2018-06NYISO
Sweet Valley SolarSolar200 MWwithdrawn2022-12NYISO
Sweet Valley StorageBatteries200 MWwithdrawn2022-12NYISO
Emerald Solar and StorageSolar174 MWwithdrawn2021-09NYISO
Brusselville Solar Energy CenterBatteries170 MWactive2024-09NYISO
Alabama Solar Park LLCSolar130 MWactive2020-02NYISO
Heritage WindWind126 MWactive2016-09NYISO
Alabama Ledge Wind FarmWind80 MWwithdrawn2005-02NYISO
Alabama Ledge WindWind80 MWwithdrawn2015-03NYISO
Tonawanda Creek WindWind75 MWwithdrawn2007-01NYISO
LeRoy SolarSolar20 MWwithdrawn2017-01NYISO
Taku WindWind20 MWwithdrawn2017-08NYISO

Big new power users asking to connect

2 on record

Requests to connect large new customers — data centers, factories, electrification — rather than power plants.

RequestCapacityStatusQueueStated use
WNY STAMP300 MWactiveNYISODAT
580 STAMP load increase300 MWactiveNYISODAT

Most of these filings do not say what the power is for. “Not stated” is the filing's silence, not ours.

How Genesee County compares

#400 in the US · #8 in NY

Genesee County ranks #400 of 1,607 US counties by power waiting to connect, and #8 of 57 in New York.

CountyWaitingCapacity queued
Suffolk County273.7 GW
Kings County83.1 GW
Orange County101.6 GW
Ulster County111.3 GW
Steuben County81.3 GW
Dutchess County71.1 GW
Nassau County21.1 GW
Montgomery County7890 MW

Common questions about power in Genesee County

How long does it take to get power for a data center in Genesee County, NY?

The median wait for a project still in the interconnection queue in Genesee County is 7.1 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Genesee County have reached energization and 16 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Genesee County, NY?

926 MW is currently requested across 4 active interconnection requests, and 280 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Genesee County, NY a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New York policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Genesee County — NYISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Genesee County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Genesee County on the map County reports All of New York