Data centers and new power in Shiawassee County, MI

920 MW of new power is waiting to connect to the grid in Shiawassee County, MI — 5 active requests. Typical wait: 1.9 years. 2 projects are built, 6 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Shiawassee County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Shiawassee County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Shiawassee County right now.

920 MW
of new power is waiting to connect
5 projects asked. Not yet approved. Roughly what 736,000 homes use.
409 MW
has actually been built
2 projects switched on so far.
1.9 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 15%
  • Still waiting 38%
  • Withdrawn 46%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Shiawassee County.

What kind of power is asking to connect

  • Wind 52%
  • Solar 29%
  • Solar + battery 18%

By capacity requested. Data as of 14 October 2026.

All the numbers

13 requests ever filed
Pending applications
5
of 13 ever filed
Capacity queued
920 MW
requested, not committed
Already built
409 MW
2 projects connected
Built vs decided
25.0%
6 withdrawn
Median wait
1.9 yr
for applications still pending
Connected capacity
287 MW
indicator, see note

Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built2409 MW15.4%
Still waiting5920 MW38.5%
Withdrawn6870 MW46.2%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Wind2480 MW
Solar2270 MW
Solar + battery1170 MW

Key dates for projects here

1 dated · next closes 2027-09-10 (MISO)
QueueWhat closesClosesStanding
MISOMISO DPP-2026 Definitive Planning Phase application deadline
Attachment X of the tariff and BPM-015.
2027-09-10confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 13 by size
ProjectTypeCapacityStatusFiledQueue
NELSON ROAD - STYX 345.0kVWind300 MWwithdrawn2024-04MISO
CORNELL - LAYTON 138.0kVWind250 MWactive2024-12MISO
Goss 138kV SubstationSolar239 MWcompleted2017-06MISO
GOSS - THETFORD 345.0kVWind230 MWactive2024-12MISO
Cornell - Bell Rd 138 kV Line TapSolar170 MWwithdrawn2018-03MISO
Cornell - Bell Road 138 kV LineSolar170 MWcompleted2019-04MISO
BELL ROAD - CORNELL 138.0kVSolar + battery170 MWactive2025-05MISO
Cornell - Layton 138 kV Line TapSolar150 MWwithdrawn2018-03MISO
Cornell - Layton138kV LineSolar150 MWwithdrawn2019-04MISO
GossSolar150 MWactive2025-09MISO
BINGHAM - CORNELL 138.0kVSolar120 MWactive2022-09MISO
North Cournna - Bell Road 138 kV lineSolar50 MWwithdrawn2017-06MISO
Gross 138kVNot stated50 MWwithdrawn2022-12MISO

How Shiawassee County compares

#404 in the US · #16 in MI

Shiawassee County ranks #404 of 1,607 US counties by power waiting to connect, and #16 of 42 in Michigan.

CountyWaitingCapacity queued
Monroe County73.9 GW
Huron County163.6 GW
Livingston County62.3 GW
Branch County72.3 GW
Van Buren County112.3 GW
Washtenaw County72.2 GW
Saginaw County101.8 GW
Genesee County41.4 GW

Common questions about power in Shiawassee County

How long does it take to get power for a data center in Shiawassee County, MI?

The median wait for a project still in the interconnection queue in Shiawassee County is 1.9 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Shiawassee County have reached energization and 6 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Shiawassee County, MI?

920 MW is currently requested across 5 active interconnection requests, and 409 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Shiawassee County, MI a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Michigan policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Shiawassee County — MISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.